Dutch Legislation

Article 7:766

in force

Contracting for work · Special provisions for the construction of a dwelling commissioned by a natural person not acting in the exercise of a profession or business

Civil Code — Book 7 (specific contracts) · Title 12 · Section 2 · In force since 2003-09-01

Source
1.

An agreement as referred to in Article 765 shall be entered into in writing.

2.

The deed drawn up between the parties or a copy thereof must be handed over to the principal, if so desired against the issuance to the contractor of a dated receipt. During three days after this handing over, the principal has the right to dissolve the agreement. If, after the principal has made use of this right, a new agreement is concluded between the same parties within six months with regard to the same dwelling to be constructed, the right shall not arise again.

3.

Paragraphs 1–2 shall not apply if the agreement extends to the construction of a dwelling on land already belonging to the client, and the agreement is not related to the purchase of this land.

1.

Een overeenkomst als bedoeld in artikel 765 wordt schriftelijk aangegaan.

2.

De tussen partijen opgemaakte akte of een afschrift daarvan moet aan de opdrachtgever ter hand worden gesteld, desverlangd tegen afgifte aan de aannemer van een gedateerd ontvangstbewijs. Gedurende drie dagen na deze terhandstelling heeft de opdrachtgever het recht de overeenkomst te ontbinden. Komt, nadat de opdrachtgever van dit recht gebruik gemaakt heeft, binnen zes maanden tussen dezelfde partijen met betrekking tot dezelfde te bouwen woning opnieuw een overeenkomst tot stand, dan ontstaat het recht niet opnieuw.

3.

De leden 1–2 zijn niet van toepassing indien de overeenkomst strekt tot de bouw van een woning op grond die de opdrachtgever reeds toebehoort, en de overeenkomst niet met de koop van deze grond in verband staat.