Article 7:754
in forceContracting for work · Contracting for work in general
The contractor is obliged, upon entering into or performing the contract, to warn the client of inaccuracies in the assignment insofar as he knew or reasonably ought to have known them. The same applies in the event of defects and unsuitability of items originating from the client, including the ground on which the client has a work performed, as well as errors or defects in plans, drawings, calculations, specifications, or performance instructions provided by the client.
In the case of the construction of a building, a warning as referred to in paragraph 1 shall be given in writing and unequivocally, and the contractor shall point out to the principal in a timely manner the possible consequences for the proper performance of the agreement. This paragraph may not be deviated from to the detriment of the principal, insofar as the principal is a natural person not acting in the exercise of a profession or business.
De aannemer is bij het aangaan of het uitvoeren van de overeenkomst verplicht de opdrachtgever te waarschuwen voor onjuistheden in de opdracht voor zover hij deze kende of redelijkerwijs behoorde te kennen. Hetzelfde geldt in geval van gebreken en ongeschiktheid van zaken afkomstig van de opdrachtgever, daaronder begrepen de grond waarop de opdrachtgever een werk laat uitvoeren, alsmede fouten of gebreken in door de opdrachtgever verstrekte plannen, tekeningen, berekeningen, bestekken of uitvoeringsvoorschriften.
Bij aanneming van een bouwwerk geschiedt een waarschuwing als bedoeld in lid 1 schriftelijk en ondubbelzinnig en wijst de aannemer de opdrachtgever tijdig op de mogelijke gevolgen voor de deugdelijke nakoming van de overeenkomst. Van dit lid kan niet ten nadele van de opdrachtgever worden afgeweken, voor zover de opdrachtgever een natuurlijk persoon is die niet handelt in de uitoefening van een beroep of bedrijf.