Article 7:760

in force

Contracting for work · Contracting for work in general

Civil Code — Book 7 (specific contracts) · Title 12 · Section 1 · In force since 2003-09-01

Source
1.

The consequences of an improper execution of the work, which is attributable to defects in or unsuitability of materials or auxiliary means used by the contractor, shall be for the account of the contractor.

2.

If, however, the defective execution is attributable to defects in or unsuitability of items originating from the principal, including the ground on which he has a work executed, the consequences shall be for his account, insofar as the contractor has not breached his duty to warn as referred to in Article 754 or has not otherwise failed in expertise or care with regard to these defects.

3.

Paragraph 2 shall apply mutatis mutandis in the event of errors or defects in plans, drawings, calculations, specifications or execution instructions provided by the principal.

1.

De gevolgen van een ondeugdelijke uitvoering van het werk, die te wijten is aan gebreken of ongeschiktheid van door de aannemer gebruikte materialen of hulpmiddelen, komen voor rekening van de aannemer.

2.

Is de ondeugdelijke uitvoering echter te wijten aan gebreken of ongeschiktheid van zaken afkomstig van de opdrachtgever, daaronder begrepen de grond waarop hij een werk laat uitvoeren, dan komen de gevolgen voor zijn rekening, voor zover de aannemer niet zijn in artikel 754 bedoelde waarschuwingsplicht heeft geschonden of anderszins met betrekking tot deze gebreken in deskundigheid of zorgvuldigheid tekort is geschoten.

3.

Lid 2 is van overeenkomstige toepassing in geval van fouten of gebreken in door de opdrachtgever verstrekte plannen, tekeningen, berekeningen, bestekken of uitvoeringsvoorschriften.